Bid Evaluation Criteria for Successful Project Delivery in Private Sector

Authors

  • Neil Ian V. Laquian Master of Science in Construction Management, Polytechnic University of the Philippines, Sta. Mesa, Manila, Philippines Author

DOI:

https://doi.org/10.65339/ijsair.V2.I3.761

Keywords:

Bid Documents, Bid Evaluation Criteria, Contractor Attributes, Contractor Selection, Financial Capacity, Private Construction Projects, Project Managers, Relative Importance Index, Technical and Managerial Capability

Abstract

This study developed project-specific bid evaluation criteria for private construction projects in Pampanga by determining the importance project managers assigned to contractor attributes and supporting bid documents. Anchored in Utility Theory, Prospect Theory, Multi-Attribute Utility Theory, and Decision Theory, the study employed a quantitative research design using survey questionnaires. A total of 150 licensed engineers and architects with at least 10 years of professional experience participated through judgmental sampling. Data were analyzed using the Relative Importance Index to rank contractor attributes and bid documents according to project type and respondent profile. The findings showed that Technical and Managerial Capability received the highest weight for residential and industrial projects, while Experience and Past Performance ranked first for commercial projects. Bid Price was the dominant criterion for infrastructure projects, whereas Financial Capacity consistently received the lowest weight across all project categories. Differences were also observed according to professional and organizational profiles. Engineers and consultants prioritized Technical and Managerial Capability, architects emphasized Experience and Past Performance, and client representatives assigned the greatest importance to Bid Price. Most supporting bid documents received relatively balanced weights; however, Health, Environmental, Safety, and Social Management Plans and records of historical contract non-performance, pending litigation, and litigation history were consistently rated lower. The study concluded that contractor selection should use a project-specific, multi-criteria framework rather than rely solely on the lowest bid. Further research was recommended on the relationship between contractors’ contractual history and actual project performance and on infrastructure bid criteria using performance specifications. The study supports SDGs 8, 9, 11, 12, and 16 by promoting competent contractors, reliable infrastructure, efficient resource use, safer project delivery, and transparent procurement decisions. Its sustainability impact lies in strengthening economic, institutional, operational, environmental, and occupational performance in private construction projects.

References

Akkaya, M. (2021). Utility: Theories and models. International Series in Operations Research and Management Science, 306, 3-14. https://doi.org/10.1007/978-3-030-70281-6_1

Aranuwa, F. O., & Sade, T. B. (2023). Optimized bids evaluation model for improved performance and quality delivery in public procurement sector and construction projects. Science and Development, 7(1), 15-29.

Asian Development Bank. (2021). User guide for procurement of works standard bidding document. http://dx.doi.org/10.22617/TIM210536-2

Aznar, B., Pellicer, E., Davis, S., & Ballesteros-Pérez, P. (2017). Factors affecting contractor’s bidding success for international infrastructure projects in Australia. Journal of Civil Engineering and Management, 23(7), 880-889. https://doi.org/10.3846/13923730.2017.1341955

Benezra, E. (2020). The qualifications-based selection (QBS) procurement method. A SAJO Publication, 4-8.

Buzzetto, R. R., Bauli, M. R., & de Carvalho, M. M. (2020). The key aspects of procurement in project management: Investigating the effects of selection criteria, supplier integration and dynamics of acquisitions. Production, 30, e20190112, 1-18. https://doi.org/10.1590/0103-6513.20190112

Cao, S. (2023). A review of decision theory and methods. The Frontiers of Society, Science and Technology, 5(3), 58-63. https://doi.org/10.25236/FSST.2023.050311

Cheaitou, A., Larbi, R., & Housani, B. A. (2019). Decision making framework for tender evaluation and contractor selection in public organizations with risk considerations. Socio-Economic Planning Sciences, 68, 1-9. https://doi.org/10.1016/j.seps.2018.02.007

Chen, Z., Zhang, X., Rodriguez, R. M., Pedrycz, W., & Martinez, L. (2021). Expertise-based bid evaluation for construction-contractor selection with generalized comparative linguistic ELECTRE III. Automation in Construction, 125, 1-12. https://doi.org/10.1016/j.autcon.2021.103578

Dave, R., Parmar, K., Patel, B., & Prajapati, R. (2017). The criteria for contractors’ selection and bid evaluation & factors affecting bidding strategy in construction. International Journal of Scientific Development and Research (IJSDR), 2(4), 488-491.

Egboga, I., & Daniel, C. O. (2022). How relevant is the Iron Triangle as a measure of construction project performance. World Journal of Management and Business Studies, 2(1), 1-14.

El Sawalhi, N. I., & El Agha, O. (2017). Multi-attribute utility theory for selecting an appropriate procurement method in the construction projects. Journal of Construction in Developing Countries, 22(1), 75-96. https://doi.org/10.21315/jcdc2017.22.1.5

FIDIC. (2011). FIDIC procurement procedures guide (1st ed.). https://pdfcoffee.com/fidic-procurement-procedures-guide-1st-ed-2011-pdf-free.html

FIDIC. (2017). Selection of contractors - Proposed alternative mechanisms to award construction works contracts (1st ed.). https://www.ecindia.org/MEMBERS/Selection%20of%20Contractors%20-%20Alternative%20Mechanisms%20-%20First%20Edition%202017.pdf

Gautam, S., & Kumar, P. (2021). Prospect theory in investment decisions. RFI Publications, 1-5. https://www.researchgate.net/publication/371702429_PROSPECT_THEORY_IN_INVESTMENT_DECISIONS

Giri, E. O. P. (2019). Study on the role of project manager in improving the project performance. Technical Journal, 1(1), 133-139. https://doi.org/10.3126/tj.v1i1.27711

Göküz, B., & Akiner, I. (2025). Investigating key factors influencing the success of construction projects at international level. Discover Civil Engineering, 1-21. https://doi.org/10.1007/s44290-025-00194-z

Government Procurement Policy Board. (2008). Volume 3 manual of procedures for the procurement of infrastructure projects. https://www.gppb.gov.ph/wp-content/uploads/2023/06/GPM-Volume-3.pdf

Gransberg, D. D., Touran, A., & Scheepbouwer, E. (2020). Qualification-based selection of consultants and contractors: Breaking the lowest tender price culture. Proceedings of International Structural Engineering and Construction, 1-6. https://doi.org/10.14455/ISEC.2020.7(2).PRO-02

HMINA, H., & HNICHE, O. (2022). Understanding and measuring project success, a key ingredient in project management: An analytical research paper. International Journal of Accounting, Finance, Auditing, Management and Economics (IJAFAME), 3(6-1), 292-305. https://doi.org/10.5281/zenodo.7418305

Ikhtiar Alam, S. M. (2022). Prospect theory: Logic and fallacy. https://www.researchgate.net/publication/359122023_Prospect_Theory_Logic_and_Fallacy

Japan International Cooperation Agency. (2023). Standard bidding document under Japanese ODA loans. https://www.jica.go.jp/Resource/english/our_work/types_of_assistance/oda_loans/oda_op_info/guide/tender/c8h0vm0000aoesst-att/works_2019.pdf

Kamaruddeen, A. M., Tze Hui, S. N., & John, O. N. (2019). Identification of contractor selection criteria for construction projects in the eastern region of Malaysia. Science Arena Publications Specialty Journal of Architecture and Construction, 5(4), 81-94.

Khakimin, A. L., Witjaksana, B., & Tjendani, H. T. (2022). Contractor selection criteria affecting project performance construction Seba Pier Port Facilities, Sabu Raijua, NTT. International Journal on Advanced Technology, Engineering, and Information System (IJATEIS), 1(3), 51-60.

Khanal, E. B. P. (2019). Contractor selection method for construction work and its effect in Nepal. International Journal of Innovative Science and Research Technology, 4(12), 141-146.

Kiiru, H. W., Wanyona, G., Diang’a, S., & Kihoro, J. (2024). The influence of contractors’ selection attributes: A study of public construction projects performance in Kenya. East African Journal of Business and Economics, 7(1), 295-312. https://doi.org/10.37284/eajbe.7.1.2017

Kumar, V. S., & Dhevasena, P. R. (2021). Factors influencing contractors selection in construction projects. International Journal of Trend in Scientific Research and Development (IJTSRD), 5(2), 24-28.

Laryea, S. (2021). Economic principles of bidding for construction projects. In G. Ofori (Ed.), Research companion to construction economics (pp. 1-22). Elgar, Cheltenham (forthcoming).

Letarge, B., Quezon, E. T., & Macarubbo, Y. C. (2016). Evaluation on the performance of lowest responsive bid contract and the quality of materials used on governmental building projects in Jimma Town. International Journal of Scientific & Engineering Research, 7(12), 60-73.

Maqsoom, A., Bajwa, S., Zahoor, H., Thaheem, M. J., & Dawood, M. (2019). Optimizing contractor’s selection and bid evaluation process in construction industry: Client’s perspective. Revista de la Construcción, 18(3), 1-14. https://doi.org/10.7764/rdlc.18.3.445

Naji, K. K., Gunduz, M., & Falamarzi, M. H. (2022). Assessment of construction project contractor selection success factors considering their interconnections. KSCE Journal of Civil Engineering, 1-14. https://doi.org/10.1007/s12205-022-1377-6

Osazuwa, E. M., & Chukwuemeka, A. (2024). Assesment of factors affecting building contractors selection in Edo State, Nigeria. PM World Journal, 13(3), 1-12.

Pollack, J., Helm, J., & Adler, D. (2018). What is the Iron Triangle, and how has it changed? International Journal of Managing Projects in Business, 11(2), 527-547. https://doi.org/10.1108/IJMPB-09-2017-0107

Republic Act No. 12009. (2023). https://www.gppb.gov.ph/new-government-procurement-act-republic-act-no-12009/

Republic Act No. 9184. (2002). https://www.gppb.gov.ph/wp-content/uploads/2023/06/Republic-Act-No.-9184.pdf

Reta, A., & Alyew, A. (2022). Determining the effects of awarding lowest bid price system on the construction projects of Ethiopian Southern Nation. Journal of University of Shanghai for Science and Technology, 24(1), 253-260.

Sakhare, V. D., & Patil, G. S. (2019). Construction equipment monitoring: By using Relative Important Indices (RII) analysis. International Research Journal of Engineering and Technology (IRJET), 6(11), 261-263.

Shankar, B. B., & Radhika, K. L. (2017). Contractor’s critical factors influencing project success: A case of Indian construction. International Journal for Research in Applied Science & Engineering Technology (IJRASET), 5(11), 1803-1808.

Shelton, B. (2018). Qualifications-based selection (QBS): Best practice for architecture, engineering and construction management/general contractor procurement in Canada. A QBS Canada Publication, 1-33.

Shukery, N. M., Amirudin, R., & Sofield, T. (2016). Level of importance of performance-based tender evaluation indicators. Indian Journal of Science and Technology, 9(34), 1-8. https://doi.org/10.17485/ijst/2016/v9i34/100842

Silva, G. A. S. K., Warnakulasuriya, B. N. F., & Arachchige, B. J. H. (2016). Criteria for construction project success: A literature review. SSRN Electronic Journal, 697-717. https://doi.org/10.2139/ssrn.2910305, 697-717.

Singh, M., & Sharma, S. K. (2020). Critical success factors in construction projects. International Journal of Recent Technology and Engineering (IJRTE), 8(5), 1799-1804. https://doi.org/10.35940/ijrte.E6408.018520

Singh, M., Singh, H. P., & Sakale, R. (2024). Effective tendering process management in construction project: A case study. International Journal of Progressive Research in Engineering Management and Science (IJPREMS), 4(8), 445-459.

World Bank. (2020). Standard bidding documents procurement of works. https://documents1.worldbank.org/curated/en/323361581052752931/pdf/Standard-Bidding-Documents-Procurement-of-Works.pdf